Slant_fin Jaguar Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Slant_fin Jaguar. Slant/Fin Jaguar User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 36
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
HOT WATER/GAS
MULTIPLE AND
CASCADING BOILERS
APPLICATION GUIDE
Printed in the U.S.A. 711 Publication No. CJ-10-HWG
www.slantfin.com
Guidelines for the design, purchase and installation of Slant/Fin Jaguar J-390C Caravan gas-fired, hot water multiple boiler systems.
®
CONTENTS
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . .2
Boiler room design & layout . . . . . . . . . . . . . . . . . . . . . .4
Fresh air and contamination prevention . . . . . . . . . . . . .6
Piping and Wiring Flow
Boiler room air supply & ventilation . . . . . . . . . . . . . . . . .6
Venting requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Water piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Condensate removal . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Gas line sizing and layout . . . . . . . . . . . . . . . . . . . . . . .16
Jaguar Multiple Boiler System Control . . . . . . . . . . . . .18
Cascading – Jaguar link method and wiring . . . . . . . . .19
Reset curves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24
External signal & energy management (Tekmar 275) . . . . . . .28
Hybrid Boiler System . . . . . . . . . . . . . . . . . . . . . . . . . . .34
CODES AND STANDARDS
All Caravan installations must comply to local codes or, in the
absence of local codes, to the National Fuel Gas Code, ANSI,
Z223.1-latest edition.
In addition where required by the authority having jurisdiction, the
installation must conform to American Society of Mechanical
Engineers Safety Codes for controls and safety devices for
automatically fired boilers, No. CSD-1. The installation must also
conform to the additional requirements of Slant/Fin Instruction Book
publication no. J-40 latest edition.
All electrical wiring is to be done in accordance with the National
Electrical Code ANSI/NFPA No. 70-latest edition and all local electri-
cal codes. The unit must be electrically grounded if an external
power source is used.
In Canada, the installation must be in accordance with standards
CGA B149.1 and B149.2, installation codes for gas burning
appliances and equipment and/or local codes. All electrical
connections are to be made in accordance with Standard C.S.A.
C22.1 Canadian Electrical Code Part 1 and/or local codes.
INTRODUCTION OF FRESH WATER
Introduction of excessive amounts of fresh water into a system can
cause scaling and leave deposits in the boiler and the surrounding
pipes. This will lead to inefficient boiler operation and breakdown.
Fresh water will enter the system as a result of hidden leaks such
as may occur in underground piping. Relief valves should be piped
to a location that shows visible signs of relief.
Process applications that use fresh water, require the use of heat
exchangers. Any process application that results in introduction of
fresh water into a boiler can cause scaling with deposits forming in
the boiler and surrounding piping. This will damage the boiler.
Introduction of fresh water from leaks will cause similar damage.
In some areas it may be necessary to use a feed water treatment to
control the corrosive makeup of the feed water. Check with the local
authority, to determine if the feed water will need a conditioning
treatment before being supplied to the boiler.
Przeglądanie stron 0
1 2 3 4 5 6 ... 35 36

Podsumowanie treści

Strona 1 - CASCADING BOILERS

HOT WATER/GASMULTIPLE ANDCASCADING BOILERSAPPLICATION GUIDEPrinted in the U.S.A. 711 Publication No. CJ-10-HWGwww.slantfin.comGuidelines for the des

Strona 2 - 2. RATINGS AND DIMENSIONS

Jaguar Caravan Multiple and Cascading Boilers10Figure 5.

Strona 3 - Figure 1. Dimensions

Jaguar Caravan Multiple and Cascading Boilers 11Figure 6. Alternative multiple side wall air intake & exhaust venting.Note:• Air intake opening mu

Strona 4

Jaguar Caravan Multiple and Cascading Boilers12Figure 7.

Strona 5

Jaguar Caravan Multiple and Cascading Boilers 13Figure 8. Direct Venting and Air Intake Through a Roof.** Knowledge of local conditions will reveal th

Strona 6

Jaguar Caravan Multiple and Cascading Boilers147. CONDENSATE REMOVAL SYSTEMThe Jaguar J-390C boiler is equipped with a built-in condensationdrain and

Strona 7

Jaguar Caravan Multiple and Cascading Boilers 15Figure 10. shows typical field piped primary loops for Jaguar Multiple boiler systems. Each Jaguar bo

Strona 8

Jaguar Caravan Multiple and Cascading Boilers16Figure 11. shows water primary piping using Slant/Fin headers. Each Jaguar boiler shall be installed wi

Strona 9 - Wall thickness - 3” to 14”

Jaguar Caravan Multiple and Cascading Boilers17GAS PIPINGThis section contains sizing and construction recommendationsfor fuel supply piping to Carava

Strona 10 - Figure 5

Jaguar Caravan Multiple and Cascading Boilers18FROMHEADER3 1/4”TYPFigure 12.Typical gas supply installation for Jaguar boiler.NominalIron PipeSize Inc

Strona 11

Jaguar Caravan Multiple and Cascading Boilers 19JAGUAR MULTIPLE BOILER SYSTEM CONTROLThe two common control methods for Jaguar MultipleBoiler Systems

Strona 12 - Figure 7

Jaguar Caravan Multiple and Cascading Boilers21. INTRODUCTIONIf additional information is desired please contact your localSlant/Fin Sales Representat

Strona 13

Jaguar Caravan Multiple and Cascading Boilers20Maximum of 8 boilers could be set up for cascading. See page 3 forpiping instruction. A water supply sy

Strona 14 - PLASTIC TUBING

Jaguar Caravan Multiple and Cascading Boilers 21Figure 14.

Strona 15

Jaguar Caravan Multiple and Cascading Boilers22Figure 15.

Strona 16 -

Jaguar Caravan Multiple and Cascading Boilers 2310.2 SET DISPLAYSSet the switch on the rear of the displays as follows:Master Boiler: ON (Down Posit

Strona 17 - 9. GAS LINE SIZING AND LAYOUT

Jaguar Caravan Multiple and Cascading Boilers24MODE DISPLAYDESCRIPTIONChanging space heating post pump time. Settable from 10 to 900 seconds.(steps of

Strona 18

Jaguar Caravan Multiple and Cascading Boilers 257070 60 -20-10 -3001020304050Outdoor Temp. (°F)WaterSupplyTarget Temp.(°F)185 °F1401501301901801701601

Strona 19

Jaguar Caravan Multiple and Cascading Boilers2610.7 CHANGING SYSTEM WATER TEMPERATURESetting system supply water temperature for space heating(see tab

Strona 20 - 10.1 ELECTRICAL WIRING

Jaguar Caravan Multiple and Cascading Boilers 27MODE DISPLAY DESCRIPTION & TEMPERATURE DISPLAYNO FUNCTIONNO FUNCTIONNO FUNCTIONTemperature display

Strona 21 - Figure 14

Jaguar Caravan Multiple and Cascading Boilers28MODE DISPLAY DESCRIPTION & TEMPERATURE DISPLAYFollower boiler is on stand-by mode.Temperature displ

Strona 22 - Figure 15

Jaguar Caravan Multiple and Cascading Boilers 29An external control with 0-10 Vdc output such as Tekmar 265 or 275could be used to operate up to 4 boi

Strona 23 - BOILER CONTROL

Jaguar Caravan Multiple and Cascading Boilers 3‘’‘’‘’‘’ ‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’‘’** “L” Dimensions and spacing between boilers are for Slan

Strona 24 - DESCRIPTION

Jaguar Caravan Multiple and Cascading Boilers30J5J8J1SWITCH (MUST BE ON"OFF"POSITION)9 10 11 12 13 14 BOILER TERMINALSWHITEBLACKNOTE: FOR EA

Strona 25 - Target Temp

Jaguar Caravan Multiple and Cascading Boilers 31MODE DISPLAY DESCRIPTION & TEMPERATURE DISPLAYNO FUNCTIONNO FUNCTIONNO FUNCTIONTemperature display

Strona 26

Jaguar Caravan Multiple and Cascading Boilers32LOCKOUT ERRORS: Indicated by an “A” in the mode display. The reset button must be pressed to clear the

Strona 27

Jaguar Caravan Multiple and Cascading Boilers 33BLOCKING ERRORS: Indicated by an “E” in the mode display. Operation is automatically restored, once th

Strona 28 - “Boiler Operation Status”

Jaguar Caravan Multiple and Cascading Boilers34ERROR CODE INDICATION REMEDY30Excess Flue TemperatureCheck flue gas temperature, at the maximum firing

Strona 29

Jaguar Caravan Multiple and Cascading Boilers 35A “Hybrid Condensing/Non-Condensing Boiler System” isa combination of condensing and non-condensing bo

Strona 30

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LTEE, Mississauga, Ontariowww.slantfin

Strona 31

Jaguar Caravan Multiple and Cascading Boilers4SAFETYKEEP THE BOILER AREA CLEAR AND FREE FROMCOMBUSTIBLE MATERIALS, GASOLINE AND OTHERFLAMMABLE VAPORS

Strona 32

Jaguar Caravan Multiple and Cascading Boilers 5Figure 2. Typical layout of 3 Jaguar Boilers using Slant/Fin Headers (Minimum Clearance)

Strona 33

Jaguar Caravan Multiple and Cascading Boilers64. FRESH AIR AND CONTAMINATION PREVENTIONThe combustion air supply must not be susceptible to contamina-

Strona 34

Jaguar Caravan Multiple and Cascading Boilers 76. VENTING REQUIREMENTSThe Jaguar J-390C is a sealed combustion type boiler, it may beinstalled and ven

Strona 35

Jaguar Caravan Multiple and Cascading Boilers8VENT AND AIR INTAKE RESTRICTIONS1. Maximum allowed equivalent vent and air intake length for all of the

Strona 36

Jaguar Caravan Multiple and Cascading Boilers 9Wall opening for Slant/Finvent air intake terminationHeight - 5 3/4"Width - 12 3/4”Wall thickness

Komentarze do niniejszej Instrukcji

Brak uwag