Slant_fin EC-10 Assembly Instructions Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Slant_fin EC-10 Assembly Instructions. Slant/Fin EC-10 Assembly Instructions User Manual [cs] [en] [pl] [de] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 12
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
EUTECTIC EC-10
OIL-FIRED WATER BOILERS/NO. 2 OIL
ASSEMBLY INSTRUCTIONS
Tools required:
• 1 Phillips screwdriver
• 1 Wide flat screwdriver
• 1 13mm open end wrench
• 1 19mm open end wrench
©Slant/Fin Corp. 2014 • Printed in the U.S.A. 1214 • Part # 470901000 • Publication No. EC-10-50 Rev.B
Przeglądanie stron 0
1 2 3 4 5 6 ... 11 12

Podsumowanie treści

Strona 1 - EUTECTIC EC-10

EUTECTIC EC-10OIL-FIRED WATER BOILERS/NO. 2 OILASSEMBLY INSTRUCTIONS Tools required:• 1 Phillips screwdriver• 1 Wide flat screwdriver• 1 13mm open en

Strona 2 - Basic or S/F-10

10Push the burner into the burnerdoor until it will not go any further.Fix the burner using four washersand hex nuts, supplied.Note:After the installa

Strona 3 - Installing the base

1116Final levelling of the boiler- Level the boiler by adjusting its adjustable feet (preins-talled on the base).(1) basic height 1”,adjustment range

Strona 4 - (opening at left)

171Stick the nameplate and other labels on the side of the boiler.Rating plate.Place “DANGER” label as shown, near front.Place nozzle spec/burner set

Strona 5 - 8575N022

2Boiler Boiler Casting Sub-Assembly Jacket and InsulationControl PanelBasic or S/F-10for EC-10 SeriesEC-13 470001000 470008200Basic – 470014000SF-10 –

Strona 6 - 8575N024

31Put a protective piece of cardboard on the floor in frontof the boiler casting sub-assembly. Take the body off the pallet and put it down vertically

Strona 7 - Honeywell Aquastat

4343544.24.38575N0188575N019Loosen the 2 top and bottom nuts.Remove the lower and upper hinges.8575N020131212- Remove the cast iron hinge pin for the

Strona 8 - Installing the side panels

5568575N021A- Pass the strap between the cast iron body and the base.- Install the insulation around the body, folding the bottom on each side of the

Strona 9 - 8575N031D

68575N023B145636214788575N0249101078- Put the rear cross bar into place on the lugs of the rearsection facing the outside of the boiler positioning it

Strona 10 - Assembling the burner

79Attach one end of the burner wiring harness (cable)to control box, and route other end through hole in controlpanel support cross bar. (Shown with H

Strona 11 - Assembling the front cap

810Put the front of the side panel into place, engagingthe lower notch of the panel in the cross bar of the base.Make sure that the lower fold in the

Strona 12

911Installing the rear panelHang up the rear panel on the side panels.Fix it using four self tapping screws + serratedwashers delivered in the fastene

Komentarze do niniejszej Instrukcji

Brak uwag