Slant_fin Gas Hot Water Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Slant_fin Gas Hot Water. Slant/Fin Gas Hot Water User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 24
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
HOT WATER/GAS Modular Boilers
APPLICATION GUIDE
Publication No. CG-10-HWG
Printed in the U.S.A. 1212
www.slantfin.com
Guidelines for the design, purchase and installation of Slant/Fin Caravan gas-fired, hot water modular boiler systems.
®
CONTENTS
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Ratings and dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . .2,3
Recommended Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Optional factory supply and return headers . . . . . . . . . . . . . .5
Boiler room design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Boiler room air supply requirements . . . . . . . . . . . . . . . . . . . .6
Typical layouts for gas-fired systems . . . . . . . . . . . . . . . . . . .7
Venting a gas-fired system . . . . . . . . . . . . . . . . . . . . . . . . . .8,9
Gas piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10,11
Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11,12
SC- control bill of
m
aterials . . . . . . . . . . . . . . . . . . . . . . . . . .12
Field wiring at modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
SC-3 system wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
SC-3 ladder wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
SC-9 space heating wiring . . . . . . . . . . . . . . . . . . . . . . . . . .16
SC-9 space heating ladder wiring . . . . . . . . . . . . . . . . . . . . .17
SC-9 space and domestic hot water wiring . . . . . . . . . . . . .18
SC-9 space and domestic hot water ladder wiring . . . . . . . .19
Caravan warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21,22
Request for Caravan rating plate . . . . . . . . . . . . . . . . . . .23,24
CODES AND STANDARDS
All Caravan installations must comply to local codes or, in the
absence of local codes, to the National Fuel Gas Code, ANSI,
Z223.1-latest edition.
In addition where required by the authority having jurisdiction, the
installation must conform to American Society of Mechanical
Engineers Safety Codes for controls and safety devices for
automatically fired boilers, No. CSD-1. The installation must also
conform to the additional requirements of Slant/Fin Instruction Book
publication no. GG-100-40 latest edition.
All electrical wiring is to be done in accordance with the National
Electrical Code ANSI/NFPA No. 70-latest edition and all local electri-
cal codes. The unit must be electrically grounded if an external
power source is used.
In Canada, the installation must be in accordance with standards
CGA B149.1 and B149.2, installation codes for gas burning
appliances and equipment and/or local codes. All electrical
connections are to be made in accordance with Standard C.S.A.
C22.1 Canadian Electrical Code Part 1 and/or local codes.
Many state and local codes require intermittent ignition devices for
gas boilers. Please specify if necessary.
INTRODUCTION OF FRESH WATER
Introduction of excessive amounts of fresh water into a system can
cause scaling and leave deposits in the boiler and the surrounding
pipes. This will lead to inefficient boiler operation and breakdown.
Fresh water will enter the system as a result of hidden leaks such
as may occur in underground piping. Relief valves should be piped
to a location that shows visible signs of relief.
Process applications that use fresh water, require the use of heat
exchangers. Any process application that results in introduction of
fresh water into a boiler can cause scaling with deposits forming in
the boiler and surrounding piping. This will damage the boiler.
Introduction of fresh water from leaks will cause similar damage.
In some areas it may be necessary to use a feed water treatment to
control the corrosive makeup of the feed water. Check with the local
authority, to determine if the feed water will need a conditioning
treatment before being supplied to the boiler.
LOCAL CODE APPROVALS
New York City:
GGT and GGHT Caravan Modules - MEA 283-93-E Vol. II
Slant/Fin vent damper NYS approval No. 8859
Pennsylvania:
Caravan boilers are approved in Pennsylvania by PA Cert. 174-BT-S
Przeglądanie stron 0
1 2 3 4 5 6 ... 23 24

Podsumowanie treści

Strona 1 - APPLICATION GUIDE

HOT WATER/GAS Modular BoilersAPPLICATION GUIDEPublication No. CG-10-HWGPrinted in the U.S.A. 1212www.slantfin.comGuidelines for the design, purchase a

Strona 2 - INTRODUCTION

10Gas Main SizingTo determine the correct pipe diameter for the gas main serving a specific Caravan system, proceed as follows:a. Follow the building

Strona 3 - Design Data

10 20 30 40 50 60 701/4 .364 32 22 18 15 14 12 113/8 .493 72 49 40 34 30 27 251/2 .622 132 92 73 63 56 50 463/4 .824 278 190 152 130 115 105 961 1.049

Strona 4 - RECOMMENDED PIPING

12This control can be programmed as follows:1. Outdoor reset: The supply water temperature is automatically adjusted up or down based on outdoor tempe

Strona 5 - OPTIONAL EQUIPMENT

13FIELD WIRING AT MODULES

Strona 6 - BOILER ROOM AIR SUPPLY

14SC-3 SYSTEM WIRING DIAGRAM

Strona 7

15SC-3 LADDER WIRING DIAGRAM

Strona 8 - VENTING A GAS-FIRED SYSTEM

16SC-9 SPACE HEATING WIRING DIAGRAM

Strona 9 - Gas Code NFPA 54

17SC-9 SPACE HEATING LADDER WIRING DIAGRAM

Strona 10 - GAS PIPING

18SC-9 SPACE AND DOMESTIC HOT WATER WIRING DIAGRAM

Strona 11 - CONTROLS

19SC-9 SPACE AND DOMESTIC HOT WATER LADDER WIRING DIAGRAM

Strona 12 - Material List for SC-9

2* Specify gas by name, "Natural" or "Propane".† Net ratings are based on piping and pick-up allowance of 1.15. Slant/Fin should

Strona 13 - FIELD WIRING AT MODULES

20BOILER WARRANTIESLifetime Limited Warrantyfor Residential Cast-iron Hot WaterBoilers in Household UseGas Models: Sentinel, Sentry, Galaxy and Victor

Strona 14 - SC-3 SYSTEM WIRING DIAGRAM

21Additional Warranty TermsAll Boiler ModelsWarranty extends only to boilers which have been properlyinstalled, operated and maintained in acc

Strona 16

CARAVAN SYSTEM RATING PLATESystem rating plate format for Caravan modular boiler system. System rating plates are available upon request using the for

Strona 17

REQUEST FOR CARAVAN SYSTEM RATING PLATENOTE:INDICATE ACCURATELYSome model numbers are similar, such as GGT-600 and GGT-600E etc.PLEASE USE CARE TO MAK

Strona 18

3Design DataMax. ASME Working Pressure: 100 psiPower Requirements: 120 volts, 60 HZ, .34 amps per moduleFigure 1: Gas Caravan dimensions and typica

Strona 19

4Figure 2. Recommended boiler piping for variable circulationFigure 3. Supply and return piping locationsFigure 4. Instantaneous tankless coil—two tem

Strona 20 - BOILER WARRANTIES

5EQUIPMENT INCLUDEDGGT SERIES — Hot Water ModelsOne per module unless otherwise noted• Pre-assembled heat exchangers with built-in air separatorsand i

Strona 21 - Additional Warranty Terms

6BOILER ROOM DESIGNCaravan modular boiler systems allow better utilization of floorspace and permit future expansion with minimum cost. Caravanmodules

Strona 22

7Figure 8. Typical layouts for gas-fired systems

Strona 23 - CARAVAN SYSTEM RATING PLATE

8VENTING A GAS-FIRED SYSTEMA boiler venting system provides an escape path for the products ofcombustion. There are three major components for venting

Strona 24 - : 516-484-2600

9Figure 9. Connector riseFigure 10. Suggested venting system constructionsConnector Rise: Connector rise is the length of the pipe connecting thetop o

Komentarze do niniejszej Instrukcji

Brak uwag