Slant_fin LX-150CB Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Slant_fin LX-150CB. Slant/Fin LX-150CB User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 44
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS
AND STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS
WARNING
SEE “WARNING” ON PAGE 4 FOR LIQUEFIED
PETROLEUM (L.P.) PROPANE GAS-FIRED BOILERS
The installation must conform to the requirements of
the authority having jurisdiction or, in the absence of
such requirements, to the National Fuel Gas Code,
ANSI Z223.1-latest edition. The installation must also
conform to the additional requirements in this Slant/Fin
Instruction Book.
In addition where required by the authority having juris-
diction, the installation must conform to American
Society of Mechanical Engineers Safety Code for
Controls and Safety Devices for Automatically Fired
Boilers, No. CSD-1.
WARNING
This boiler, gas piping and accessories must be
installed, connected, serviced and repaired by a
trained, experienced service technician, familiar with all
precautions required for gas-fired equipment and
licensed or otherwise qualified, in compliance with the
authority having jurisdiction.
WARNING
The venting system of this boiler is under positive pres-
sure. Leakage from this system can be hazardous and if
not avoided can result in death or serious injury. In addition
to the recommendations within this manual and the User’s
Information Manual, the venting system, from the flue col-
lector to the outdoor discharge, must be carefully checked
annually by a qualified service agency.
This manual must be left with owner and should be
hung on or adjacent to the boiler for reference.
LYNX
INSTALLATION AND OPERATING INSTRUCTIONS
Printed in U.S.A. 1013 Part No. 81-5011000 Publication No. LXCB-40 Rev. B
Heating Contractor
Address
Phone Number
Boiler Model Number
Boiler Serial Number
Installation Date
DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER
HOT WATER MODEL LX-120CB & LX-150CB
GAS-FIRED BOILERS FOR NATURAL AND L.P. PROPANE GASES
TABLE OF CONTENTS
Dimensions, Rating and Orifice Sizes ........................................2
Identification of Parts ........................................................................3
Installation Requirements .................................................................4
Contamination Prevention.................................................................5
Mounting the boiler on a wall............................................................6
Venting Application ...........................................................................6
Boiler Room Air Supply and Ventilation............................................6
Flue Gas Venting Requirements.......................................................7
Additional Installation Requirements for Massachusetts..................7
Vent and Air Intake Material .............................................................8
PVC/CPVC Pipe General Assembly Method....................................8
Vent and Air Intake Restrictions .......................................................8
Sidewall Venting, Non-Direct Vent ..................................................10
Vent Termination Location and Clearance......................................10
Non-Direct Vent Installation ............................................................10
Direct Vent Installation ....................................................................10
Sidewall Venting, Direct Vent ..........................................................10
Vent/Air Intake Termination Installation...........................................16
Direct Vent, Venting and Air Intake through a Roof........................17
Venting and Air Intake Regular Inspection .....................................18
Condensate Removal System ........................................................18
Gas Piping ......................................................................................18
Electrical Wiring ..............................................................................19
Wiring Diagram...............................................................................20
Single and Multi Zoning..................................................................22
Water Piping ...................................................................................24
Domestic Hot Water........................................................................26
Operating Instructions.....................................................................31
Boiler Control and Display..............................................................31
Boiler Operating Status ..................................................................32
Viewing and changing temperature................................................33
Viewing and changing system setting ............................................34
Initial start and operating instruction ..............................................36
Sequence of Operation...................................................................37
Combustion check and fuel input rate ............................................38
Safety Check .................................................................................38
Diagnostic error codes ...................................................................39
Care and Maintenance ...................................................................42
General Troubleshooting Guide ......................................................43
COMBI
BOILER
Przeglądanie stron 0
1 2 3 4 5 6 ... 43 44

Podsumowanie treści

Strona 1 - IMPORTANT

IMPORTANTREAD ALL OF THE FOLLOWING WARNINGSAND STATEMENTS BEFORE READING THEINSTALLATION INSTRUCTIONSWARNINGSEE “WARNING” ON PAGE 4 FOR LIQUEFIEDPET

Strona 2 - RATINGS AND DIMENSIONS

Lynx Combi Boiler10VENTING INSTALLATIONOnly the PVC/CPVC, Polyproylene and approved stainlesssteel materials listed on page 8 may be used for the vent

Strona 3

Lynx Combi Boiler11NON-DIRECT VENT, SIDEWALL VENTINGAll joints must be liquid and pressure tight. Use 3” dia. PVC/CPVC schedule 40 pipe, 3" nomin

Strona 4

Lynx Combi Boiler12NON-DIRECT VENT, VENTING THROUGH A ROOFAll joints must be liquid and pressure tight. Use 3” dia. PVC/CPVC schedule 40 pipe, 3"

Strona 5

Lynx Combi Boiler13NON - DIRECT VENT, UTILIZING AN EXISTINGCHIMNEY AS A CHASEAll joints must be liquid and pressure tight. Use 3” dia. PVC/CPVC schedu

Strona 6

Lynx Combi Boiler14DIRECT VENT, SIDEWALL VENTINGAll joints must be liquid and pressure tight. Use 3” dia. PVC/CPVC schedule 40 pipe, 3" nominal I

Strona 7

Lynx Combi Boiler15Figure 13a. Vent/Air intake termination; utilizingPVC/CPVC pipe for venting.Figure 13b. Vent/Air intake termination; utilizing stai

Strona 8

Lynx Combi Boiler16VENT/AIR INTAKE TERMINATION FOR PVC/CPVC, OR POLYPROPYLENE VENTING INSTALLATION (P# 840802000) This termination is designed specifi

Strona 9

Lynx Combi Boiler17B. DIRECT VENT - VENTING AND AIR INTAKE THROUGH A ROOFFigure 14 shows typical vertical venting. The vent pipe must pass through th

Strona 10 - Lynx Combi Boiler

Lynx Combi Boiler18VENTING AND AIR INTAKE SYSTEM REGULAR INSPECTIONA. Inspect the system regularly for condensation, corrosion, sagging and/or physic

Strona 11

Lynx Combi Boiler19At 30 ft. length of pipe, match required capacity from table onthis page (choose higher capacity, in this case is 152 cu. ft. perho

Strona 12

LX-120CB 6 5/8 3 3/8 2 16 1/4LX-150CB 6 3/8 3 3/4 2 3/4 19BOILER "A" "B" "C"

Strona 13 - CHIMNEY AS A CHASE

Lynx Combi Boiler20J2CIRCULATORDHWHCIRCULATORNHWWBKNHBOILER1HOTL160HZ120VNEUTRALL2GROUNDFIELD WIRED, FIELD SUPPLIEDWITH TYPE 105C OR ITS EQUIVALENT.P

Strona 14 - DIRECT VENT, SIDEWALL VENTING

Lynx Combi Boiler21ARGUS VISION CONTROL NOT USEDNOT USEDT2J12J13SPARK IGNITORSPARKCABLEGROUNDFUSEJ9J6J2J5BOILER CONTROLFigure 16b. Boiler Control.M120

Strona 15

Lynx Combi Boiler221ENDSWITCHTH-TRMOTOR2TTT T TT TT TT TT T TTTT3456SPACEHEATINGSYSTEMCIRCULATORENDSWITCHTH-TRMOTORZONE 2THERMOSTATV8043E/FENDSWITCHTH

Strona 16

Lynx Combi Boiler23Figure 17c. Multizoning of Lynx boiler; pump zoning system using R882A/B relays.LIL21DISCONNECTSWITCH120V/24VTRANSFORMERFIELD WIRIN

Strona 17 - THROUGH A ROOF

Lynx Combi Boiler24WATER PIPING A. Connection of system to boiler:Primary/secondary piping should be used to ensure theproper flow through the boiler.

Strona 18

Lynx Combi Boiler25Figure 18. Relief Valve and Low Water Cutoff Installation

Strona 19

Lynx Combi Boiler26Figure 19. Boiler water side pressure dropTable 2. DHW teperature rise vs. water flow002468101214246810 Head(feet w.c.)Flow Rate

Strona 20 - 12 K Ohm

Lynx Combi Boiler27Figure 20. Zoning with circulators.

Strona 21 - BOILER CONTROL

Lynx Combi Boiler28Figure 21. Zoning with zone valves.

Strona 22

Lynx Combi Boiler29Figure 22. Piping a heating-cooling system to the boiler and a chiller.

Strona 23

Lynx Combi Boiler3CONDENSATEDRAINBOILERDRAINVALVEWATERRETURNSENSORSPARKELECRODES(IGNITER)WATERSUPPLYSENSORHEATEXCHANGERTEMPERATUREDISPLAYPOWERSWITCHPR

Strona 24

Lynx Combi Boiler30INSTALL TEMPERING VALVE(NOT SUPPLIED WITHTHE BOILER)Figure 23. DHW piping.

Strona 25

Lynx Combi Boiler31OPERATING INSTRUCTIONSI. FILLING AND VENTING WATER SYSTEMSA. Fill the system with water. Vent or purge of air.B. Fire the boiler as

Strona 26

Lynx Combi Boiler32*"MODE" DISPLAY"TEMPERATURE" DISPLAY (3 DIGITS)"UP" PUSH BUTTON"DOWN" PUSH BUTTON"ENTE

Strona 27

Lynx Combi Boiler33MODEDISPLAYDESCRIPTION & TEMPERATURE DISPLAYSpace heating supply water temperature could be changed bypressing “Up/Down” button

Strona 28

Lynx Combi Boiler34MODE DISPLAYDESCRIPTIONChanging space heating post pump time. Settable from 10 to 900 seconds.(steps of 10 seconds). The default va

Strona 29

Lynx Combi Boiler357070 60 -20-10 -3001020304050Outdoor Temp. (°F)WaterSupplyTarget Temp.(°F)185 °F1401501301901801701601201101008090200Slope = 4.0Slo

Strona 30 - INSTALL TEMPERING VALVE

Lynx Combi Boiler36III. INITIAL STARTSafe lighting and other performance criteria were met when testingvarious gas manifold and control assemblies use

Strona 31

Lynx Combi Boiler37LYNX BOILER SEQUENCE OF OPERATIONTHERMOSTAT CALLS FOR HEATCIRCULATOR(S) ON5 SECOND PRE-PURGE PERIODGAS VALVE REMAINS OPEN. CONTROLC

Strona 32 - LYNX BOILER DISPLAY BOARD

Lynx Combi Boiler38IV. Check combustion and fuel input rateA. Remove the boiler jacket front panel by turning the black screws 1/4 turn to the open po

Strona 33

Lynx Combi Boiler39ERROR CODE INDICATION REMEDY01Ignition Failure - 3 unsuccessful ignition attempts in a row.Check for steady sparking at electrodes.

Strona 34 - *: Alternating **: Steady

Lynx Combi Boiler4The installation must conform to the requirements of theauthority having jurisdiction or, in the absence of suchrequirements, to the

Strona 35 - Target Temp

Lynx Combi Boiler40B. BLOCKING ERRORS: Indicated by an “E” in the mode display. Operation is automatically restored, once the condition returns to nor

Strona 36

Lynx Combi Boiler41ERROR CODE INDICATION REMEDY30Excess Flue TemperatureCheck flue gas temperature, at the maximum firing rate and high water temperat

Strona 37

Lynx Combi Boiler42CARE AND MAINTENANCEThis section must be brought to the attention of the owner by theinstaller so that the owner can make the neces

Strona 38

Lynx Combi Boiler43GENERAL TROUBLESHOOTING GUIDE FOR SERVICE PERSONNELWARNING: Only a trained, experienced service technician should perform troublesh

Strona 39

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LTE E, Mississauga, Ontariowww.slantfi

Strona 40

CONTAMINATION PREVENTIONThe combustion air supply must not be susceptible to contami-nation sources, whether the combustion air comes from theinterior

Strona 41

Lynx Combi Boiler6MOUNTING THE BOILER ON A WALLBe sure that the wall is vertically plumb and capable of carryingthe weight of the boiler and the syste

Strona 42

A. NON-DIRECT VENT INSTALLATION1. Air drawn horizontally from outdoors DIRECTLY throughan outside wall; one louvered opening near the floor andone lou

Strona 43

Lynx Combi Boiler8VENT AND AIR INTAKE MATERIALSThe vent and air intake system for direct or non-direct vent installationmust be 3” diameter PVC/CPVC s

Strona 44 - ©Slant/Fin Corp. 2013

Lynx Combi Boiler93. The vent termination is in addition to the allowed equivalent lengths. 4. Minimum vent length is 2 feet of straight pipe, plus on

Powiązane modele: LX-120CB

Komentarze do niniejszej Instrukcji

Brak uwag